Drivers near Waltham Abbey face a planned M25 clockwise carriageway and lane closure from 10:00pm on Monday 23 November 2026. It is due to end at 6:00am on Saturday 28 November 2026.
Which part of the M25 will close near Waltham Abbey?
The closure covers the clockwise carriageway between Jct 25 and Jct 27. The work is listed as routine maintenance.
How long could M25 delays be, and what is the diversion?
National Highways expects moderate delays of 10 - 30 mins. The diversion is via Local Authorities and the National Highways Network.
Is there another M25 closure nearby on 23 November?
Yes. An anti-clockwise lane closure for electrical works is listed between Jct 26 and Jct 25 from 10:00pm on Monday 23 November 2026. No end time is given for that separate closure.
How can I check the M25 closure before travelling?
Check National Highways live travel updates before setting off for the latest traffic and roadworks information.
About the figures
National Highways’ planned roadworks listing was published on 22 January 2026 and gives the scheduled dates, diversion and expected delay. These are planned works; check live updates before travelling.




































