Drivers travelling across Essex overnight on Sunday 22 November should plan for closures on the A12 and at the Dartford Crossing. The A12 southbound closure between junctions 12 and 11 is scheduled from 10:00pm on Saturday 21 November to 5:00am on Monday 23 November.
Which Essex roads close overnight on 22 November?
The main planned closures and longer-running works are listed below. Dates and times are scheduled, so check for changes before setting off.
| Road | Section | Scheduled period | Work or expected delay |
|---|---|---|---|
| A12 southbound | Junction 12 to junction 11 | 10:00pm on Saturday 21 November to 5:00am on Monday 23 November | Signs maintenance; moderate (10 - 30 mins) |
| A282 northbound | Dartford Crossing East Tunnel | 10:00pm on Saturday 21 November to 5:30am on Sunday 22 November | Contraflow; diversion via National Highways Network |
| A282 northbound | Dartford Crossing West Tunnel | 9:00pm on Monday 2 November to 5:30am on Saturday 28 November | Maintenance; diversion via National Highways Network |
| M11 and M25 | M25 anti-clockwise link roads at junction 27 to M11 northbound and southbound | 10:00pm on Saturday 21 November to 5:30am on Sunday 22 November | Urgent carriageway repairs; diversion via local authorities and National Highways Network |
| A13 | Listed A13 works | 10:30pm on Saturday 21 November to 5:30am on Sunday 22 November | Planned overnight works |
| A1089 northbound | Marshfoot to A13 westbound link road | 10:00pm on Monday 16 November to 5:30am on Tuesday 24 November | Lane and link road closure for drainage; moderate (10 - 30 mins) |
| A12 both directions | M25 junction 28/A12 junction 11 to Ingatestone | 9:00pm on Monday 16 November to 5:00am on Tuesday 24 November | Litter clearance; slight (less than 10 mins) |
| A12 northbound | Junction 27 to junction 28 | 9:00pm on Wednesday 11 November to 5:00am on Monday 23 November | Carriageway reconstruction; moderate (10 - 30 mins) |
| A120 both directions | West Street to Colchester Road, Coggeshall Bypass | 8:00pm on Monday 9 November to 6:00am on Saturday 28 November | Carriageway closure and diversion; severe (more than 30 mins) |
| A12 both directions | Junction 29 | 9:00pm on Monday 19 October to 5:00am on Monday 25 January 2027 | Drainage works; slight (less than 10 mins) |
Source: National Highways planned roadworks listings, covering scheduled works from 19 October 2026 to 25 January 2027. The expected delays are estimates, not a guarantee of journey times.
Which closures have the biggest effect on a journey?
The A12 southbound closure lasts beyond Sunday night, ending at 5:00am on Monday 23 November. Drivers using that stretch should allow for the closure across both weekend nights.
The Coggeshall Bypass listing carries an expected delay of severe (more than 30 mins) and runs until Saturday 28 November. National Highways lists a diversion, but the roadworks notice does not give its route.
At the Dartford Crossing, the East Tunnel contraflow is scheduled for Saturday night into Sunday morning. The West Tunnel has a separate maintenance closure scheduled through to Saturday 28 November. The listings give a moderate expected delay for the tunnel works.
How can I check road closures before travelling?
Check National Highways live travel updates before leaving, as planned closures can change. Essex County Council also provides local roadworks information through Essex Highways.
About the figures
National Highways published the roadworks notices on dates ranging from 20 August 2025 to 12 November 2026. They cover scheduled works from 19 October 2026 to 25 January 2027, including closures planned for the night of Saturday 21 November into Sunday 22 November. These are planned works and timings may change.








































