The application, reference 26/01203/BC3, concerns a replacement for the platform lift at a property in South Avenue, in St Lukes ward, Southend-on-Sea. Southend-on-Sea Council’s planning register records the proposal as “Replace existing platform lift to front”.
The register lists the application as “Registered”, while also recording a decision of “Grant Conditional Permission” on 3 November 2026. It does not explain the difference between those status fields, and the conditions themselves should be checked in the council’s decision documents.
What is planned for the South Avenue lift?
The proposal is to replace an existing platform lift at the front of the property, rather than to add a lift where there was none before. The register gives no further description of the building work, but a report by the Echo says the replacement is intended to match the existing lift in size.
The Echo reported that the replacement would measure 1.8 metres wide, 1.4 metres high and 2.25 metres deep. It also described a bridging step, a remote security system and a waterproof circuit board as features of the proposed lift.
According to the Echo, the existing lift had suffered multiple faults, and pests had damaged its circuit board. That background offers a practical reason for the replacement proposal, but the council’s register entry itself states only that the existing platform lift is to be replaced.
What has Southend-on-Sea Council decided?
The register records “Grant Conditional Permission”, with a decision date of 3 November 2026. It says the decision was made under delegated powers, rather than identifying a council committee as the decision-maker.
Conditional permission means the approval is subject to conditions. The summary information does not set out what those conditions require, so it cannot establish from the status alone whether they relate to design, timing or another aspect of the work. The decision notice and associated documents on the planning register are the authoritative places to check their wording.
The application is classified as “Borough Council Regulation 3”, not as a householder application. That is the application type recorded by the council; the register summary does not provide further explanation of the classification.
When was the platform lift application submitted?
Southend-on-Sea Council records that it received and validated the application on 9 September 2026. It was published on 3 November 2026, the same date shown for the decision.
The register does not give an appeal status or an appeal decision. Nor does the summary state when replacement work will begin or be completed. Planning permission is the decision recorded here; it is not a timetable for carrying out the work.
How to view the planning application or make a comment
Residents can search Southend-on-Sea Council’s online planning register using reference 26/01203/BC3. The application documents and decision notice are the best sources for the submitted plans and the precise conditions attached to the permission.
Because a decision is recorded, anyone wishing to submit a comment should check the register or contact the council’s planning service to ask whether comments can still be accepted and how they would be handled. The available summary does not state a closing date for comments or describe any post-decision process.
Questions and answers
Has the South Avenue platform lift application been approved?
Yes. Southend-on-Sea Council’s register records “Grant Conditional Permission” on 3 November 2026. The approval is subject to conditions, which should be checked in the decision notice.
What is planning application 26/01203/BC3 for?
It is a proposal to replace the existing platform lift at the front of a property in South Avenue, in St Lukes ward, Southend-on-Sea.
How can I see the plans for the Southend lift application?
Search for 26/01203/BC3 on Southend-on-Sea Council’s online planning register and review the submitted documents and decision notice.
When will the replacement lift be installed?
The planning register does not state an installation date or construction timetable.