The decision covers surface-water drainage, foul-water drainage and who will manage and maintain the sustainable drainage network for Phase 5 Parcel 9.
It clears these conditions for that part of the scheme. It is not a new decision approving the whole development, and it does not show that building work has been completed.
Which conditions were cleared for Phase 5 Parcel 9?
The application concerns three conditions attached to the wider permission:
- Condition 9: the surface-water drainage scheme
- Condition 10: details of who is responsible for managing and maintaining all parts of the proposed SuDS network
- Condition 16: foul-water drainage
Source: Maldon Council’s planning register, decision issued 17 November 2026.
What does the wider Great Totham permission allow?
The underlying hybrid permission, allowed on appeal, covers a mixed-use development at land around Broad Street Green Road, Langford Road and Maypole Road. It includes up to 1138 dwellings, with 30% as affordable housing, and residential care for up to 120 beds.
The wider plans also include neighbourhood uses, a primary school and early-years childcare facility, a relief road between Broad Street Green Road and Langford Road, open space and associated infrastructure. The conditions cleared in this decision relate specifically to Phase 5 Parcel 9.
How can residents check the Maldon planning decision?
Residents can read the application summary and check its documents on Maldon Council’s planning register. For general guidance on planning permission in England and Wales, see the GOV.UK planning permission guide.
About the figures
Maldon Council’s planning register lists application 25/05144/DET as received on 14 November 2025 and validated on 15 November 2025. It records the decision as Conditions Cleared, with the status Conditions discharged, on 17 November 2026; the application was published on 17 November 2026. This is a notification about specified conditions, not confirmation that the drainage works have been built.

























