Installation a new 10kVA generator on existing concrete base. Power duct to be installed. Wide cable trunking to be installed on concrete base. AMF panel to be installed on new support pole. Vertiv PSU cabinet to be retained.
Photo: Christopher Hilton via Wikimedia Commons, CC BY-SA 2.0
Key takeaways
- Ward: Great Parndon North
- Address: Telecommunications Mast At EGT Radio Site Elizabeth Way Harlow Essex
- Decided: 2026-10-12
- Proposal: Installation a new 10kVA generator on existing concrete base. Power duct to be installed. Wide cable trunking to be installed on concrete base. AMF panel to be installed on new support pole. Vertiv PSU cabinet to be retained.
- Received: 2026-09-17
- Reference: HW/TELD/26/00377
- Validated: 2026-09-17
- Appeal status: Not Available
- Decided by: Not Available
- Appeal decision: Not Available
- Application type: Telecoms - Determination