Skip to content

Unplanned power cut affects Buckhurst Hill area

An unplanned outage is affecting the IG9 5 area of Buckhurst Hill, with most supplies expected back by 2:30pm on Sunday 22 November 2026. UK Power Networks says engineers are dealing with a fault on equipment controlling local electricity supplies.

By · Published · Updated

Photo: Stacey Harris via Wikimedia Commons, CC BY-SA 2.0

In this article9 sections
  1. Key takeaways
  2. Which part of Buckhurst Hill is affected?
  3. What is causing the power cut?
  4. How can I check for updates?
  5. About the figures
  6. What to do in a power cut
  7. Sources
  8. Further reading
  9. Related topics and towns

Key takeaways

  • Status: Restored
  • Postcode areas: IG9 5
  • Reported: 10:47am on Sunday 22 November 2026

Update 1:53pm on Sunday 22 November 2026

Power supplies in the IG9 5 area of Buckhurst Hill have been restored, after an earlier estimate that they would be back by 2:30pm on Sunday 22 November 2026.

UK Power Networks now lists the outage as restored. Supplies in the IG9 5 area of Buckhurst Hill came back at 1:13pm on Sunday 22 November 2026, ahead of the 2:30pm time the company had previously given for most properties.

The company says a fault occurred on a piece of its electrical equipment which controls the power to homes in the area. Its message to customers is that the problem with the electricity supply has been repaired, that there may still be some tidying up to do, and that the details have been passed to its maintenance department to attend to as soon as possible.

Update 12:13pm on Sunday 22 November 2026

UK Power Networks now says 36 properties are affected by the unplanned cut in the IG9 5 area of Buckhurst Hill, and the time it was reported has moved to 10:47am on Sunday 22 November 2026.

UK Power Networks now puts the number of properties affected by the unplanned power cut in the IG9 5 area of Buckhurst Hill at 36. The company says the cause is a fault on a piece of its electrical equipment that controls the power to local homes.

The outage was reported at 10:47am on Sunday 22 November 2026. It had earlier been logged at 10:31am on the same day.

The power cut was reported at 10:31am on Sunday 22 November 2026. UK Power Networks’ estimate is for most supplies to be restored by 2:30pm; the time may not apply to every affected property.

Which part of Buckhurst Hill is affected?

The outage is listed for the IG9 5 postcode area. The incident listing records 2 calls reported and 0 customers affected in its separate customer count field, so it does not establish how many homes are without power.

What is causing the power cut?

UK Power Networks says a fault has occurred on electrical equipment that controls power to homes. Its incident message identifies LV fuse replacement or linking, and says engineers are dealing with it.

How can I check for updates?

Check the UK Power Networks power-cut map for the latest incident status and restoration estimate. The reference for this incident is INCD-420675-J.

About the figures

UK Power Networks published the incident on Sunday 22 November 2026. It is listed as unplanned; the restoration time is an estimate for most supplies, and the listing’s customer count does not show how many properties are affected.

Explained

What to do in a power cut

Call 105, free, to report a power cut or check what is happening. In Essex the local electricity network is run by UK Power Networks.

  • Call 105, free, to report a power cut or get an update.
  • In Essex the electricity network is run by UK Power Networks, not your energy supplier.
  • Stay well away from fallen power lines and call 105. Call 999 if anyone is in danger.
Read the guide

Related topics and towns