The power cut in Chelmsford’s CM1 2 area has been marked as restored. UK Power Networks reported it at 6:15am and said supplies were back by 6:52am on Thursday 19 November 2026.
The operator’s earlier restoration window was 08:30 to 09:30 on 19 November 2026, so power was restored before that estimate.
What caused the power cut in Chelmsford’s CM1 2 area?
UK Power Networks said a fault occurred on a piece of electrical equipment that controls power to homes. It did not give more detail about the equipment or the precise location of the fault.
How can residents check for power cut updates?
Residents can check UK Power Networks’ power cut map for updates. UK Power Networks advises calling 105 if there is danger, damage to its equipment or no access to online services.
About the figures
The figures are from UK Power Networks’ live power cuts listing for 19 November 2026. It gives the affected area as CM1 2 and the status as restored, but shows 0 customers affected and 0 calls reported. The listing therefore does not provide a count of households that experienced an interruption.

































